PROJECT NAME: SUPPLY & INSTALL OF 1.5MVA 6.6KV/433V GROUNDMOUNT TRANSFORMER

Project Summary: Supply and installation of 1500kVa Secondary Crusher Transformer at Evolution Mining, Mount Rawdon Project

Client: Evolution Mining – Mount Rawdon Operations

Timeframe: Installation January 2017

PROJECT NAME: KOMATSU DUMP TRUCK INFRASPECTION FOR EXHAUST MODIFICATION

Project Summary: Perform infraspection and provide report on efficency of Double Skinned Exhaust and Turbo & Exhaust Lagging

Client: Aletek Advanced Exhaust Technologies

Timeframe: September 2022

PROJECT NAME: MANUFACTURE & INSTALLATION OF PORTABLE SUBSTATION

Project Summary: Design, manufacture and installation of 6.6kV/433V stainless steel portable substation for Decant Dam evaporator pump/sprays supply and associated HV cabling at Evolution Mining, Mount Rawdon Project

Client: Evolution Mining – Mount Rawdon Operations

Timeframe: Installation January 2022

PROJECT NAME: RELOCATE & REFURBISH 1.5MVA TRANSFORMER

Project Summary: Relocated and refurbished 1.5MVa oil-filled transformer, redesigned, manufactured and replaced HV air box, added flanges to radiators to necessitate quick removal and ease of transport and placement, removed and replaced all gaskets and repainted with high build epoxy and polyurethane coatings.

Client: Bundaberg Sugar Pty Ltd

Timeframe: Installation January 2022